Huaigang Bridge Old Bridge Demolition Project


The Huaigang Bridge was completed in 1990 and has been in existence for more than 20 years. It has been reinforced several times, but now the bridge disease situation is still serious, and its navigation clearance does not meet the requirements of the canal channel at present, and the bridge deck capacity is also limited, it has already become a traffic bottleneck on Xi'an Road. Considering that the bridge design load and width conditions can no longer meet the existing traffic demand, the old bridge need to demolished and rebuilt to meet the highway traffic demand.

The main bridge type of Huaigang Bridge is a single-tower double cable-stayed bridge with a bridge span arrangement of 64m+90m+ 2×20m and a total length of 204m.